Riverwizz

Share This Post

Avis à la batellerie Flandre

TR: [avis-a-la-batellerie-flandre] 20201209_NtS message 2020/2226/01 was published

De : noreply@visuris.be <noreply@visuris.be>
Envoyé : mercredi 9 décembre 2020 15:14
À : avisbfrance@gmail.com
Objet : [avis-a-la-batellerie-flandre] 20201209_NtS message 2020/2226/01 was
published

Dear,

The NtS message 2020/2226/01 was published.

Kind regards,
The VisuRIS team
You receive this message because you are subscribed to the mailing list
‘Scheepvaartberichten’ on the ‘VisuRIS’ web application.

Announcement: Work

published by De Vlaamse Waterweg nv on 09/12/2020, 15:13

Valid from 14/12/2020 to 15/12/2020

For Fairway Albertkanaal, km 112,0 to km 111,5 is valid
* on 14/12/2020, from 07:00 o’clock to 19:00 o’clock the following
limitation:
* No passing
* on 15/12/2020, from 07:00 o’clock to 19:00 o’clock the following
limitation:
* No passing

For bridge opening Brug Massenhoven, km 111,8 (Albertkanaal) is valid
* on 14/12/2020, from 07:00 o’clock to 19:00 o’clock the following
limitations:
* Clearance width maximum 25 m
* Clearance width reduced by 12 m, Left bank
* Do not create wash
* Speed limit maximum 5 km/h
* on 15/12/2020, from 07:00 o’clock to 19:00 o’clock the following
limitations:
* Do not create wash
* Clearance width maximum 30 m
* Speed limit maximum 5 km/h
* Clearance width reduced by 12 m, Right bank

Additional information (Dutch):
Verboden elkaar op te lopen/kruisen 200m op- en afwaarts de brug van
Massenhoven.

Source: FTM/BE/De Vlaamse Waterweg nv/2020/2226/01

_____

<www.vlaamsewaterweg.be/emaildisclaimer> e-maildisclaimer
_____

Share This Post

Translate »